Commissioning
Well in advance of the completion of the construction phase, we manage the commissioning of the facilities up to the point of energy injection into the grid.
Our commitment includes comprehensive management of this transition, ensuring that all installations meet the required standards and are properly registered in the Electric Power Production Facilities Registry (RAIPEE), enabling their full operation and contribution to the energy supply.
INDUSTRY / MITECO
- AAC Update
- Request and Obtaining of AAE
- Preliminary and Final Registration in RAiPEE
DISTRIBUTOR
- CTA Signature
- Metering Equipment Registration
- SSAA Contract Signing
CITY COUNCIL
- Use Permit
- Activity and Opening Permit
SECTORIAL AUTHORITIES
- Final Certificate
- Minutes and Other Documentation
ELECTRIC GRID

Operational Notification of Energization
Allows energizing of interconnection and/or auxiliary services installations

Provisional Operational Notification
Allows preliminary registration in the RAIPEE

PES Approval for Pre-Operation Functionality Tests
Allows energy dumping

Final Operational Notification
Final registration in the RAIPEE